Land Subdivision Surveyors Perth
Comprehensive surveying services for Green Title, Survey Strata and Built Strata subdivisions across Perth and Western Australia.
From the initial feature survey and WAPC application through to the final placement of boundary marks and clearance collection, Jurovich Surveying can manage the technical process to ensure your new titles are issued efficiently.
Which Type of Subdivision Suits Your Block?
Green Title (Freehold)
The term most Perth owners use for a freehold lot created on a deposited plan. Each lot stands alone, with its own frontage and its own direct service connections, no common property and no strata company. The simplest outcome to own and sell, and the most demanding to create. Every lot needs a direct, individual connection to the Water Corporation's sewer main.
Survey Strata
Divides an existing freehold lot into smaller lots with surveyed boundaries, with or without common property, under the Strata Titles Act 1985. The boundaries are surveyed by a Licensed Surveyor and shown on the survey-strata plan. Usually the answer in Perth where a shared driveway is needed to reach a rear lot, because the access way can be held as common property.
Built Strata
A strata plan of subdivision for an existing building or buildings, dividing the lot into strata lots that are cubic spaces.
Boundaries are defined by reference to the building, so the building must exist. Built strata subdivisions of five lots or fewer are determined by your local government under WAPC delegation.
Can Your Block Be Subdivided?
Know Your R-Code
Your block carries a density code (an R-Code) assigned by your local planning scheme.
Table D of the Residential Design Codes Volume 1 sets two separate tests: a minimum site area per dwelling and an average site area per dwelling.
Both must be satisfied, which is where most quick calculations go wrong. A block can clear the minimum comfortably and still fail the average.
As an example, at R20 the minimum site area is 350 m² but the average is 450 m², so two lots need 900 m² between them, and a single house lot, including a rear battle-axe lot, must reach 450 m² in its own right. The WAPC can approve a lot up to five per cent below these figures in limited circumstances, but only one lot in a subdivision may carry that variation.
Site area requirements by R-Code
Site area per dwelling for single houses and grouped dwellings. The minimum lot area / rear battle-axe and minimum frontage columns apply to single houses only.
| R-Code | Minimum site area | Average site area | Minimum lot area / rear battle-axe | Minimum frontage |
|---|---|---|---|---|
| R10 | 875 m² | 1,000 m² | 925 m² | 20 m |
| R12.5 | 700 m² | 800 m² | 762.5 m² | 17 m |
| R15 | 580 m² | 666 m² | 655 m² | 12 m |
| R17.5 | 500 m² | 571 m² | 587.5 m² | 12 m |
| R20 | 350 m² | 450 m² | 450 m² | 10 m |
| R25 | 300 m² | 350 m² | 425 m² | 8 m |
| R30 | 260 m² | 300 m² | 410 m² | Not applicable |
| R35 | 220 m² | 260 m² | 395 m² | Not applicable |
| R40 | 180 m² | 220 m² | 380 m² | Not applicable |
| R50 | 160 m² | 180 m² | 160 m² | Not applicable |
| R60 | 120 m² | 150 m² | 120 m² | Not applicable |
| R80 | 100 m² | 120 m² | 100 m² | Not applicable |
Battle-Axe and Rear Lot Subdivisions
Keeping the existing house at the front and creating a new lot at the rear is a very common subdivision enquiry we take in Perth. The WAPC doesn't give special preference to battle-axe configurations and will not reduce minimum or average lot sizes for them.
- Access legs must be at least 4 metres wide in areas coded R2 to R40, and at least 3.6 metres at R50 and above.
- At R40 and below, the lot area includes the access leg — but only where the leg contributes no more than 20 per cent of the area Table D requires.
- At R50 and above, the access leg is excluded from the calculation entirely, and the lot must meet the minimum on effective area alone.
- Where the existing dwelling is retained, no eaves or other protrusions may encroach into the driveway, and there must be room for the required parking and safe vehicle manoeuvring.
That last requirement sends more Perth battle-axe projects back to the drawing board than anything else, and a feature survey finds it long before a condition of approval does.
The Subdivision Process
-
Step 1
Feature survey and design
We survey boundaries, levels, existing structures, services and trees, and prepare a subdivision design that works with the R-Code and servicing constraints rather than against them.
-
Step 2
WAPC application
Freehold and survey-strata subdivisions are lodged on Form 1A, built strata on Form 15A. We prepare the detail survey, the design plan and the supporting documents, and lodge on your behalf.
-
Step 3
Referrals
The WAPC refers the application to your local government and the servicing authorities. They have 42 days to respond — no response means no objection and no conditions from that body.
-
Step 4
Conditional approval
Most Perth subdivisions are approved subject to conditions: commonly demolition, underground power, water and sewer works, drainage easements, crossovers, and notifications on title.
-
Step 5
Clearances
Each condition must be signed off by the responsible authority. This is the stage that runs long, because one outstanding document holds up the whole subdivision. We request the clearances and chase them.
-
Step 6
Endorsement and titles
The WAPC endorses the plan, it is lodged electronically at Landgate, and the new titles issue. Title applications must be made within two years of endorsement.
How Long Does Subdivision Approval Last?
Three years for subdivisions of five lots or fewer, four years for six or more, under section 145 of the Planning and Development Act 2005.
If the approval will expire before the conditions can be cleared, a Form 4A application under section 145A may extend it by two years. Only one extension is granted, and it must be lodged before the approval expires. Perth subdivisions are regularly delayed by service authority timelines, and a lapsed approval starts again — new application, new fee, and whatever the planning rules say then rather than when you first applied.
What Does Subdivision Cost in Perth?
There is no standard figure, and any quote given without the property address and a assessment of the site is guesswork. The WAPC application fee is a published base amount plus an amount per lot. What actually moves the budget is everything else:
- Demolition, or removal of sheds, pools and structures from the new lot
- Water Corporation infrastructure contribution, and whether the lots need a cut-in junction or a mains extension
- Western Power works, including conversion from overhead to underground supply
- Crossover removal and construction, and access way construction to a rear lot
- Site works, retaining and fencing where levels change at the new boundary
- Local government requirements, which differ between Perth councils
Two identical blocks in different council areas can carry materially different costs for the same type of subdivision. We assess your site specifically before anything is committed.
SUBDIVISION SURVEYING SERVICES
Subdivision Application
Carrying out a detail survey and provision of a subdivision design plan and relevant documents for lodgement at the Western Australian Planning Commission (WAPC).
Field survey and preparation of Deposited Plan or Survey Strata Plan
Re-establishment of existing boundaries and placement of new boundary marks by a licensed surveyor.
Landgate
Preparation of plans and field notes for lodgement at Landgate.
Clearance Collection
Request subdivision clearances from local and state authorities and preparation of endorsement documents for the WAPC.
Subdivision Project Management
A complete subdivision management service, engaging the trades, contractors and professionals needed to satisfy the conditions and carrying the project through to the issuing of your new titles. You can be involved as much or as little as you like.
Get Your Fast Subdivision Quote
Please fill in the form below and we'll contact you shortly. Thank you.
For fast assistance during office hours, call 1300 570 000
Jurovich Surveying
Please contact us about your subdivision idea and one of our land subdivision surveyors will get back to you shortly. Our expertise and service makes the difference.