Newman Rail Bridge Replacement Project
Client: CPB Contractors Location: Newman, WA
All surveying for low level bridge replacement project.
Jurovich Surveying are onsite conducting all survey work for the Low Level Bridge Replacement Project including as constructed surveys of existing structures to ensure accurate design and confirm tie in points, set-out of project extents, dimensional control surveys of precast items and ongoing site survey during the construction phase.