BHP Low Level Bridge Replacement

Client: Laing O’Rourke Location: Port Hedland

Survey for the replacement of seven existing steel bridges.

Jurovich Surveying provides survey for the replacement of seven existing steel bridges on the BHP Newman Main Rail with new concrete culvert structures to ensure sustainable, safe operation of the railway and to consider future haul capacity expansion.

Jurovich provided a feature survey of existing structures, established main control, performed concrete and earthworks setout and volumes and undertook shutdown surveys for bridge replacement and rail alignment.